The mechanical, electrical, plumbing (MEP) systems that determine whether your house works for decades. Standards, materials, costs.
| Application | Wire Gauge | Load Capacity |
|---|---|---|
| Lighting circuits | 1.5mm² | 10-15 A |
| 5A power sockets | 2.5mm² | 20-25 A |
| Heavy appliances (AC, geyser) | 4mm² | 32 A |
| Main distribution | 6mm²+ | 50+ A |
Typical 10 marla home: 30-50 kVA connected load. Distributed across 8-12 circuits. Main 3-phase connection for AC + heavy loads. Generator/UPS backup separately.
Sub-standard wire, PVC pipes for hot water, no ELCB, undersized AC, no proper grounding, generator not isolated from grid.
Worth it for 10 marla+ homes. 5 kW system Rs 15-25 Lac. Payback 4-6 years on grid-tied (net metering). 7-9 years with batteries.
UPS for short outages (computers, lights, fans). Generator for long outages (full home or critical loads). Premium homes have both.