MEP Basics for House Construction in Pakistan 2026

The mechanical, electrical, plumbing (MEP) systems that determine whether your house works for decades. Standards, materials, costs.

Electrical System

Wire Specifications

ApplicationWire GaugeLoad Capacity
Lighting circuits1.5mm²10-15 A
5A power sockets2.5mm²20-25 A
Heavy appliances (AC, geyser)4mm²32 A
Main distribution6mm²+50+ A

Brands

Load Calculation (10 Marla)

Typical 10 marla home: 30-50 kVA connected load. Distributed across 8-12 circuits. Main 3-phase connection for AC + heavy loads. Generator/UPS backup separately.

Plumbing System

Pipe Types

Water Pressure System

HVAC (Mechanical)

AC Sizing (1 ton ≈ 12,000 BTU)

Options

Gas Piping

MEP Total Cost

FAQs

Most common MEP mistakes?

Sub-standard wire, PVC pipes for hot water, no ELCB, undersized AC, no proper grounding, generator not isolated from grid.

Should I add solar?

Worth it for 10 marla+ homes. 5 kW system Rs 15-25 Lac. Payback 4-6 years on grid-tied (net metering). 7-9 years with batteries.

UPS vs generator?

UPS for short outages (computers, lights, fans). Generator for long outages (full home or critical loads). Premium homes have both.