Heritage Documentation & Condition Assessment

Comprehensive heritage surveys — measured drawings, photogrammetry, material analysis, condition assessment, and conservation management plans for monuments across Pakistan.

Why Documentation Comes First

No conservation work can proceed responsibly without proper documentation. You cannot conserve what you have not understood. Documentation answers:

ICOMOS principle: "Conservation should be based on a methodical study of the building's history, materials, structural condition, and previous interventions."

Sunshine's Documentation Services

Measured Drawings

Photogrammetry + 3D Scanning

Condition Assessment

Historic Research

Conservation Management Plans (CMP)

FAQs

How long does heritage documentation take?

Small structure: 2-4 weeks. Major monument: 3-12 months for complete documentation + analysis. Crack monitoring period adds 6-12 months for structural concerns.

What deliverables do I receive?

Drawings (PDF + DWG), photo archives, condition report (PDF), historic analysis, material analysis lab reports, conservation management plan with phased recommendations + budget estimates.

Cost range for documentation?

Small heritage haveli: Rs 5-15 Lac. Major monument: Rs 25 Lac - 2 Crore. Tender-funded government surveys vary based on scope. CMP separately: Rs 5-25 Lac.

Is documentation required before any heritage work?

Yes — both ethically (ICOMOS) + procedurally. Department of Archaeology Punjab requires baseline documentation before approving any intervention on protected monuments.

Heritage Documentation & Assessment