Grey Structure Construction Cost in Pakistan 2026

Complete guide to grey structure (shell) construction costs across Pakistan. Plot-size breakdown, city-wise rates, material + labor split, and what's included.

Get Grey Structure Quote

What Is Grey Structure?

Grey structure (also called "shell" or "construction without finishing") refers to the complete structural + envelope completion of a house — but excluding finishing work. After grey structure, the house has all walls, roof, doors/windows openings, MEP rough-in, but no tiles, paint, or fixtures.

Grey structure is a common contract type in Pakistan because it lets owners manage finishing themselves — selecting materials directly, phasing finishing over months, or hiring different finishers.

What's Included in Grey Structure

Included:

Excluded:

Grey Structure Cost by Plot Size 2026

Plot SizeCovered AreaGrey Cost (Lahore)Per sqft
3 Marla~1,100 sqftRs 28-42 LacRs 2,550-3,800/sqft
5 Marla~1,700 sqftRs 45-65 LacRs 2,650-3,820/sqft
7 Marla~2,400 sqftRs 70 Lac - 1 CrRs 2,900-4,170/sqft
10 Marla~3,400 sqftRs 1-1.5 CrRs 2,950-4,410/sqft
1 Kanal~6,800 sqftRs 1.8-3 CrRs 2,650-4,410/sqft
2 Kanal~13,000-17,000 sqftRs 3.5-5+ CrRs 2,700-3,850/sqft
Per-sqft rates vary based on structural complexity, basement inclusion, quality of materials, and premium location requirements.

City-Wise Grey Structure Rates 2026

CityStandard (Rs/sqft)Premium (Rs/sqft)Notes
Lahore2,800-3,4003,600-4,200Reference city
Islamabad3,200-3,8004,000-4,800+10-12% due to materials + bylaws
Rawalpindi3,000-3,6003,800-4,500Similar to Islamabad
Karachi3,200-3,8004,000-4,800+10-15% for coastal-grade materials
Faisalabad2,500-3,0003,200-3,800-8-12% local advantage
Multan2,400-2,9003,100-3,700Most affordable major city
Peshawar2,900-3,5003,800-4,500+8-12% for seismic compliance
Sialkot2,700-3,2003,400-4,000Export-economy supports premium

Material + Labor Breakdown

Category% of Grey Cost10 Marla Example (Rs 1.2 Cr)
Cement15-18%Rs 18-22 Lac
Steel (rebar)18-22%Rs 22-26 Lac
Bricks10-13%Rs 12-15 Lac
Sand + crush5-7%Rs 6-8 Lac
Doors/windows openings (frames)3-5%Rs 4-6 Lac
Plumbing + electric rough-in8-10%Rs 10-12 Lac
Skilled labor22-26%Rs 26-31 Lac
Unskilled labor5-8%Rs 6-10 Lac
Contractor fee5-8%Rs 6-10 Lac

Grey Structure vs Turnkey Contracts

AspectGrey Structure ContractTurnkey Contract
What's includedShell onlyComplete, move-in ready
Total cost (10 marla)Rs 1-1.5 CrRs 1.8-3 Cr
Owner involvementHigh (manages finishing)Low (move in)
Material controlOwner selects all finishingContractor specs (or owner-specified premium)
Timeline6-8 months grey + 6-12 months finishing12-18 months total
Best forHands-on owners, phased budgetTime-poor owners, predictable schedule

Grey Structure Build Timeline

FAQs — Grey Structure Cost

Should I go grey or turnkey?

Grey if you want to control finishing decisions, phase the build, or buy materials directly. Turnkey if you want a single contractor accountable for the whole build + predictable timeline.

Why does grey cost vary so much?

Steel + cement market fluctuation (15-20% YoY swings). Plot conditions (filling, water table). Structural complexity (basement, span). Quality grade chosen.

Can I save by buying materials directly?

Possible 5-10% saving on bulk cement + steel if you have time + connections. Risk: storage, theft, schedule misalignment with contractor.

What inflates grey cost most?

Basement (add Rs 25-100 Lac depending on size). Premium structural design (architect-specced extra steel/concrete). Difficult plot conditions (water table, fill).

Get Grey Structure Quote